Each Shift Code should be associated with one of the following Productive shift types:
The Productive shift type assigned to the Shift Code tells each Metric (Commitment, Completeness, and Healthiness) how to use the Shift to calculate the Schedule Quality scores:
Users assigned the Shift Edit permission can assign a Productive type to a Shift (Department Shift Edit>Productive Shifts).